Difference between revisions of "PhDSupervision:Dhananjay Ipparthi"
From IridiaWiki
Jump to navigationJump to searchLine 16: | Line 16: | ||
== Academic Activities == |
== Academic Activities == |
||
− | === |
+ | === 12th - 16th August, 2013 === |
'''Plan''' |
'''Plan''' |
||
+ | * Find a shaker that shakes in a random fashion |
||
⚫ | |||
+ | * Find state of the art for multiple structure assembly |
||
⚫ | |||
− | * Read Hosokawa paper |
+ | * Read Hosokawa paper [PENDING] |
* Refinements to existing designs |
* Refinements to existing designs |
||
** Wall thickness |
** Wall thickness |
||
** Depth of magnets |
** Depth of magnets |
||
** Maximum and minumum structure sizes |
** Maximum and minumum structure sizes |
||
⚫ | |||
'''Accomplishments''' |
'''Accomplishments''' |
||
Line 31: | Line 30: | ||
'''Others''' |
'''Others''' |
||
+ | * Placed order for magnets |
||
− | * |
||
+ | |||
'''Todos''' |
'''Todos''' |
||
* |
* |
||
+ | |||
+ | === 5th - 9th August, 2013 === |
||
+ | '''Plan''' |
||
⚫ | |||
⚫ | |||
+ | * Read Hosokawa paper [PENDING] |
||
+ | * Refinements to existing designs [in progress] |
||
+ | ** Wall thickness |
||
+ | ** Depth of magnets |
||
+ | ** Maximum and minumum structure sizes |
||
⚫ | |||
+ | ** ''' Marco transferred 800Euro to my bank account on 9th August, 2013 ''' |
||
+ | |||
+ | '''Accomplishments''' |
||
+ | * Followed up with LaserScript - no response |
||
+ | |||
+ | '''Others''' |
||
+ | * Purchased external hard drive to store videos |
||
+ | |||
+ | '''Todos''' |
||
+ | * Find a shaker that shakes in a random fashion |
||
+ | * Find state of the art for multiple structure assembly |
||
+ | * Read Hosokawa paper [PENDING] |
||
=== 29th July - 2nd August, 2013 === |
=== 29th July - 2nd August, 2013 === |
Revision as of 12:24, 12 August 2013
Personal Information
Name: Dhananjay Ipparthi
Date of arrival in Brussels: 08th February, 2012
Home address: Rue des Vierges 58, 1000 Bruxelles
Telephone number: +32 483 382 207
Milestones
- Ring assemble demo in Paderborn, 20th August 2013
- Decision of continuation of fellowship, 31st January, 2014
Academic Activities
12th - 16th August, 2013
Plan
- Find a shaker that shakes in a random fashion
- Find state of the art for multiple structure assembly
- Read Hosokawa paper [PENDING]
- Refinements to existing designs
- Wall thickness
- Depth of magnets
- Maximum and minumum structure sizes
Accomplishments
Others
- Placed order for magnets
Todos
5th - 9th August, 2013
Plan
- Reorganise experiment data from Paderborn visit
- Plot compatibility curve [done]
- Read Hosokawa paper [PENDING]
- Refinements to existing designs [in progress]
- Wall thickness
- Depth of magnets
- Maximum and minumum structure sizes
- Submit expenses for reimbursement [done]
- Marco transferred 800Euro to my bank account on 9th August, 2013
Accomplishments
- Followed up with LaserScript - no response
Others
- Purchased external hard drive to store videos
Todos
- Find a shaker that shakes in a random fashion
- Find state of the art for multiple structure assembly
- Read Hosokawa paper [PENDING]
29th July - 2nd August, 2013
Plan
- Conduct single target experiments on laser cut and 3D printed components in ABS plastic IR94 container
- Conduct multiple target experiments on 3D printed and laser cut components
- Take measurements for new bracket
Accomplishments
- Conducted single target experiments with laser cut components in ABS plastic IR94 container
- 45deg segments IR25OR35
- 90deg segments OR35 circle
- 90deg segments IR15OR25
- 90deg segments IR25OR35
- Conducted single target experiments with laser cut components in acrylic IR75 container
- 45deg segments IR25OR35
- 90deg segments IR25OR35
- 90deg segments OR35 circle
- Conducted single target experiments with 3D printed components in ABS plastic IR94 container
- 45deg segments IR02OR35
- 90deg segments IR25OR35
- Conducted single target experiments with 3D printed components in acrylic IR75 container
- Conducted multiple target experiments with laser cut components in ABS plastic IR94 container
- 90deg segments IR25OR35 x2
- 90deg segments IR15OR25 x2
- 90deg segments IR15OR25 x3
- Conducted multiple target experiments with laser cut components in acrylic IR75 container
- 90deg segments OR35 circle x2
- 90deg segments IR15OR25 x3
- Conducted multiple target experiments with 3D printed components in ABS plastic IR94 container
- 45deg segments IR02OR25 x2
- 45deg segments IR02OR35 x2
- 90deg segments IR25OR35 x2
- Conducted multiple target experiments with 3D printed components in acrylic IR75 container
- 45deg segments IR02OR25 x4
Others
Todos
- Go through JICBackup_videos on kelvin workstation
22nd - 26th July, 2013
Plan
- Conduct tests on N-N error reduction designs
- Cut IR100mm container
- Bracket revision!
- Send LaserScript feedback email
- Prepare for Paderborn trip
- Make a plan for experiments
- Make a list and pack
Accomplishments
Others
Todos
- Update expenses spreadsheet [done]
- Submit expenses to Muriel [done]
15th - 19th July, 2013
Plan
- Send LaserScript email [done]
- Update SVN
- Cut IR 100mm container
- Bracket!
- Find ways to reduce N-N errors [in progress]
Accomplishments
- The laser cutter was previously not calibrated accurately and caused errors in cuts. The cutter is now better calibrated.
- Purchased 5mm plexi-glass sheet, 3 wood beams and Brico Discount Card [€195,47]
- Designed and cut three modifications to reduce N-N error
- Curved edge
- Flanged edge
- Filleted edges
Others
Todos
8th - 12th July, 2013
Plan
- Send bracket sizes to Navneet [Done, €14,59]
- Update Experiments spreadsheet [done]
- Include dimensions of Big and Small environments [done]
- Deeper cuts [done]
- Inclined holes [done]
Accomplishments
- Found suitable air-gap for components
- Found configurations for components with inclined holes to bond
- v-shape
- straight line (causes the pieces to be offset)
Others
- Meeting with Mauro:
- Purchasing acrylic in bulk
- Laser cutter calibration
To dos
- Send LaserScript email regarding errors in calibration
- Deal with bracket fit
1st - 5th July, 2013
Plan
- Paderborn visit (3rd - 5th July, 2013)
- Pack
- Camera and tripod
- Tests
- Assemble components
- Run single ring, two ring, extra pieces tests
- Shaker details
- Pack
Accomplishments
- Hand held experiments at IRIDIA
- Captured videos of single ring and multiple ring assembly experiments. Tabulated the results.
- Conducted tests with extra pieces. The extra pieces used were were:
- Quarter circle
- Full circle
- Shaker experiments in Paderborn
- Speed tests
- Acrylic environment: acrylic components and ABS plastic components
- ABS plastic environment: acrylic components and ABS plastic components
- Tabulated results
- Assembly tests
- Big acrylic environment: 90deg ring segments, 45deg ring segments, 90deg circle segments
- Small acrylic environment: 90deg ring segments, 45deg ring segments, 90deg circle segments
- Tabulated results
- Captured videos
- Speed tests
To do
- Send bracket sizes to Navneet
- Update Experiments spreadsheet
- Include dimensions of Big and Small environments
- Deeper cuts
- Inclined holes
Others
24th - 28th June, 2013
Plan
- Purchased [done]:
- Washer/spacer for M7 and M8 screws - 1 each
- 2m x 1m x 3mm Acrylic sheet - 1
- 6mm Clips - 1
- TOTAL : 111,97 Euro
- Fabricate rings with lesser width [done]
- Test to see if two rings can form simultaneously [done]
- Prepare files and equipment for transport to Paderborn
Accomplishments
- Self assembly of:
- Circle: IR 2mm OR 35mm
- 1 ring: 90deg segments IR 20mm OR 35mm
- 1 ring: 45deg segments IR 20mm OR 35mm
- 2 rings: 90deg segments IR 20mm OR 35mm
- 3 rings: 90deg segments and 45deg segments
Others
17th - 21st June, 2013
Plan
- Purchase acrylic sheets, MDF boards, sand-paper, glue [done] €184,46
- Design and fabricate container for testing in July [done v2, shelved v1]
- Design coupling that will allow any container to be easily mounted onto the shaker. [done v2, shelved v1]
- Update Design Journal and Technical Report.
- Design rings with lesser width
- Observe lateral bonding
Accomplishments
- Developed first self-assembling structure.
- Estimated cutting errors for the Laser Cutter [done]
- Included the design considerations needed to be taken into account because of the errors on the Laser cutter wiki [done]
- Details of the error testing File:LaserCutter Tests.pdf
- Purchased I-section nd L-section channels which will be used as the coupling that will join the container and the shaker. €7,59
- Purchased nuts, bolts and washers. €8,77
- Fabricated and assembled container(s) and brackets
- Containers: IR 75mm and IR 135mm
- Bracket
Other
10th - 14th June, 2013
Plan
- Submit designs for fabrication [done]
- Ensure pieces mate before submission [done]
- Update reports and address Navneet's comments
- Reorganised files and directories [done]
- Revised time lines to reflect 2 week turn around time for 3D printing [done]
- Create entries for 20130607 [done]
- Update Design journal
- Design and fabricate lid [done]
- Design revision
- Assembly simulations in SolidWorks [done]
Other
- Procured 2 suitable glues for acrylics
- Procured magnets
- Test finishing with the 2 glues
- Cut arcs with acrylic
3rd - 7th June, 2013
Plan
- RAR defense [done]
- Set up SVN [done]
- Create two docs: Lab report and detailed report and include them in SVN [done]
- Update Lab report based on meeting with Navneet [done]
- Understood basics of SolidWorks [done]
Other
- Semi ring designed in SolidWorks
1st March, 2013
Literature Review
Project Work
- Work on FRS-FNRS Fellowship application
- Work on Self-Reproduction Review Paper
- Talk in Dubai
Development
Laboratory Activities
- Assisting in big-arena robot storage setup
Ideas
Deliverable
- Synthetic Reproduction Review Paper due by May 2013
- Defense of Report of Advancement on 17th May 2013