Difference between revisions of "PhDSupervision:Dhananjay Ipparthi"
From IridiaWiki
Jump to navigationJump to searchLine 26: | Line 26: | ||
'''Accomplishments''' |
'''Accomplishments''' |
||
* The laser cutter was previously not calibrated accurately and caused errors in cuts. The cutter is now better calibrated. |
* The laser cutter was previously not calibrated accurately and caused errors in cuts. The cutter is now better calibrated. |
||
− | * Purchased 5mm plexi-glass sheet, 3 wood beams and Brico Discount Card |
+ | * Purchased 5mm plexi-glass sheet, 3 wood beams and Brico Discount Card ['''€195,47'''] |
'''Others''' |
'''Others''' |
Revision as of 09:50, 18 July 2013
Personal Information
Name: Dhananjay Ipparthi
Date of arrival in Brussels: 08th February, 2012
Home address: Rue des Vierges 58, 1000 Bruxelles
Telephone number: +32 483 382 207
Milestones
- Ring assemble demo in Paderborn, 20th August 2013
- Decision of continuation of fellowship, 31st January, 2014
Academic Activities
15th - 19th July, 2013
Plan
- Send LaserScript email
- Update SVN
- Cut IR 100mm container
- Bracket!
- Find ways to reduce N-N errors
Accomplishments
- The laser cutter was previously not calibrated accurately and caused errors in cuts. The cutter is now better calibrated.
- Purchased 5mm plexi-glass sheet, 3 wood beams and Brico Discount Card [€195,47]
Others
Todos
8th - 12th July, 2013
Plan
- Send bracket sizes to Navneet [Done, €14,59]
- Update Experiments spreadsheet [done]
- Include dimensions of Big and Small environments [done]
- Deeper cuts [done]
- Inclined holes [done]
Accomplishments
- Found suitable air-gap for components
- Found configurations for components with inclined holes to bond
- v-shape
- straight line (causes the pieces to be offset)
Others
- Meeting with Mauro:
- Purchasing acrylic in bulk
- Laser cutter calibration
To dos
- Send LaserScript email regarding errors in calibration
- Deal with bracket fit
1st - 5th July, 2013
Plan
- Paderborn visit (3rd - 5th July, 2013)
- Pack
- Camera and tripod
- Tests
- Assemble components
- Run single ring, two ring, extra pieces tests
- Shaker details
- Pack
Accomplishments
- Hand held experiments at IRIDIA
- Captured videos of single ring and multiple ring assembly experiments. Tabulated the results.
- Conducted tests with extra pieces. The extra pieces used were were:
- Quarter circle
- Full circle
- Shaker experiments in Paderborn
- Speed tests
- Acrylic environment: acrylic components and ABS plastic components
- ABS plastic environment: acrylic components and ABS plastic components
- Tabulated results
- Assembly tests
- Big acrylic environment: 90deg ring segments, 45deg ring segments, 90deg circle segments
- Small acrylic environment: 90deg ring segments, 45deg ring segments, 90deg circle segments
- Tabulated results
- Captured videos
- Speed tests
To do
- Send bracket sizes to Navneet
- Update Experiments spreadsheet
- Include dimensions of Big and Small environments
- Deeper cuts
- Inclined holes
Others
24th - 28th June, 2013
Plan
- Purchased [done]:
- Washer/spacer for M7 and M8 screws - 1 each
- 2m x 1m x 3mm Acrylic sheet - 1
- 6mm Clips - 1
- TOTAL : 111,97 Euro
- Fabricate rings with lesser width [done]
- Test to see if two rings can form simultaneously [done]
- Prepare files and equipment for transport to Paderborn
Accomplishments
- Self assembly of:
- Circle: IR 2mm OR 35mm
- 1 ring: 90deg segments IR 20mm OR 35mm
- 1 ring: 45deg segments IR 20mm OR 35mm
- 2 rings: 90deg segments IR 20mm OR 35mm
- 3 rings: 90deg segments and 45deg segments
Others
17th - 21st June, 2013
Plan
- Purchase acrylic sheets, MDF boards, sand-paper, glue [done] €184,46
- Design and fabricate container for testing in July [done v2, shelved v1]
- Design coupling that will allow any container to be easily mounted onto the shaker. [done v2, shelved v1]
- Update Design Journal and Technical Report.
- Design rings with lesser width
- Observe lateral bonding
Accomplishments
- Developed first self-assembling structure.
- Estimated cutting errors for the Laser Cutter [done]
- Included the design considerations needed to be taken into account because of the errors on the Laser cutter wiki [done]
- Details of the error testing File:LaserCutter Tests.pdf
- Purchased I-section nd L-section channels which will be used as the coupling that will join the container and the shaker. €7,59
- Purchased nuts, bolts and washers. €8,77
- Fabricated and assembled container(s) and brackets
- Containers: IR 75mm and IR 135mm
- Bracket
Other
10th - 14th June, 2013
Plan
- Submit designs for fabrication [done]
- Ensure pieces mate before submission [done]
- Update reports and address Navneet's comments
- Reorganised files and directories [done]
- Revised time lines to reflect 2 week turn around time for 3D printing [done]
- Create entries for 20130607 [done]
- Update Design journal
- Design and fabricate lid [done]
- Design revision
- Assembly simulations in SolidWorks [done]
Other
- Procured 2 suitable glues for acrylics
- Procured magnets
- Test finishing with the 2 glues
- Cut arcs with acrylic
3rd - 7th June, 2013
Plan
- RAR defense [done]
- Set up SVN [done]
- Create two docs: Lab report and detailed report and include them in SVN [done]
- Update Lab report based on meeting with Navneet [done]
- Understood basics of SolidWorks [done]
Other
- Semi ring designed in SolidWorks
1st March, 2013
Literature Review
Project Work
- Work on FRS-FNRS Fellowship application
- Work on Self-Reproduction Review Paper
- Talk in Dubai
Development
Laboratory Activities
- Assisting in big-arena robot storage setup
Ideas
Deliverable
- Synthetic Reproduction Review Paper due by May 2013
- Defense of Report of Advancement on 17th May 2013