Year 2: Feb 2013 - Feb 2014
24th - 28th February, 2014
Plan
- Insert magnets and screws into the components
 - Conduct preliminary tests on the components
 - Make necessary revisions to the design and submit
 
Accomplishments
- In Paderborn
- Made necessary revisions to ray-disc design and submitted to Hamburg
 - Designed and submitted ray-disc container designs
 - Collected videos of ray-disc experiments (in different lighting conditions as well)
 - Collected videos of conformational switching experiments
 
 
Others
Todos
17th - 21st February, 2014
Plan
- Assembly of lines
- Simple model - N components for length N
 
 
Accomplishments
Others
Todos
- Read DNA computing related literature
 - Read chapter 4 of Navneet's thesis
 
3rd - 7th February, 2014
Plan
- Update design and submit to DMRC [done]
 - Place other orders of screws to Knupfer / Jurgen [done]
 
Accomplishments
Others
Todos
27th - 31st January, 2014
Plan
- Create order and delivery table for 3D printing
- Shapeways
 - DMRC
 - Hamburg
 
 - Make list of what can be ordered and delivered to Paderborn and give it to Marco
- Discuss with Navneet
 
 - Conduct experiments on the components delivered by Shapeways (done)
 
Accomplishments
- Received magnets
 - Received Knupfer screws
 - Shapeway component results
- Tube size too big
 - Indents for the paint drops too small
 
 
Others
Todos
- Upload Shapeway component results on the svn
 
20th - 24th January, 2014
Plan
- Prepare for 3D printer arrival
- Purchase extra filament if required
 - Establish delays for filament delivery and restocking.
 
 - Verify container designs with Navneet and submit
 - Estimate annual private 3D printing services
 - Experiments on the current L-Drop design (in progress)
- List variable parameters
 - Vary parameters and test
 
 - Random shaker
 - Order micro screws from different vendor
 - Updates for bud-petal design
 
Accomplishments
Others
Todos
13th - 17th January, 2014
Plan
- Verify container designs with Navneet and submit
 - Estimate annual private 3D printing services
- Send order to Shapeways by Thursday (done)
 
 - Experiments on the current L-Drop design (in progress)
- List variable parameters
 - Vary parameters and test
 
 - Random shaker
 - Order micro screws from different vendor
 - Updates for bud-petal design
 
Accomplishments
Others
Todos
6th - 10th January, 2014
Plan
- Finalise procurement
- Screws [waiting confirmation]
 
 - Cut out acrylic
- Established tolerances for 0.5mm plexiglass - 0,34mm cumulative for circular holes.
 
 - Finalise test environments
 - Follow up with Haitham about 3D printed parts [in progress]
 
Accomplishments
- Cut out covers
- Two notches will work better for top cover
 
 - Conducted preliminary experiments
- The magnet should drop and move towards the face rather than dropping and staying in place
 - They key should move in it's slot more smoothly. Ensure screw head does not interfere with the key slot
 - The magnet should drop down more smoothly
 
 
Others
- Back up option for screws [1]
 - Issues with the graphics card of solid designing machine.
 
Todos
- Camera, lights, lens
 - Measure universal platform
 - Laser cut bracket to check if dimensions are correct
 
16th - 20th December, 2013
Plan
- Finalise procurement
- Screws [waiting confirmation]
 
 - Cut out acrylic
 - Finalise test environments
 - Meet Thomas to refine experiment hypothesis [done]
 
Accomplishments
Others
Todos
- Camera, lights, lens
 - Measure universal platform
 - Laser cut bracket to check if dimensions are correct
 
9th - 13th December, 2013
Plan
- Finalise procurement
- Acrylic [paid]
 - Screws [waiting confirmation]
 
 - Cut out acrylic
 - Design test environments
 - Design lid options
 - Refine experiment hypothesis
 
Accomplishments
Others
Todos
- Camera, lights, lens
 - Measure universal platform
 - Laser cut bracket to check if dimensions are correct
 
2nd - 6th December, 2013
Plan
- Submit first working design to DMRC
 - Follow up orders for screws and acrylic [in progress]
 - Submit receipts to Jutta
- Print out previous trip spreadsheet for personal records
 
 - Plan experiments
 
Accomplishments
Others
Todos
- Camera, lights, lens
 - Digital weighing scale [2]
 - Measure universal platform
 - Laser cut bracket to check if dimensions are correct
 
25th - 29th November, 2013
Plan
- Tally accounts
- Submit receipts to Jutta
 - Print out previous trip spreadsheet for personal records
 
 - Measure universal platform
- Laser cut bracket to check if dimensions are correct
 - Spacing of holes
 - Holes
 - Length, breadth and width
 
 - Pick up components from DMRC [done]
 - Experiments with other magnets (N52) and Bismut
 
* Follow up orders for screws and acrylic
Accomplishments
Others
Todos
- Camera, lights, lens
 - Digital weighing scale
 
18th - 22nd November, 2013
Plan
- Submit designs for printing: [done]
- L-drop component and key
 - Straight drop component and key
 - Test block to try different components
 
 - Enquire about screws and acrylic sheet
 - Update SVN
 - Purchase
- Screws
 - Acrylic
 - Bismut [done]
 
 
Accomplishments
Others
Todos
11th - 15th November, 2013
Plan
- Pick up new components from DMRC
 - Test new components
- Which magnets to use? --> 3mm side cube, 5mm side cube
 - What size of components? --> 50mm radius, 25mm height (earlier 35mm) (done)
 - What size of keys? --> Increase dimensions of shaft, change shaft shape (incline to L) (done), keep wall thickness 1.5 (reduce to 1?)
 - What gaps between magnet and ferromagnetic material?
- --> For attraction the gap should ideally be a maximum 2mm. This means that since there is a 0.5mm air gap between the key and the magnet, the wall thickness should ideally be 1mm.
 - --> To ensure there is no attraction between the ferromagnetic material and the magnet (> 3mm side cube) the separation should be at least 15mm
 
 - Which ferromagnetic material? --> screw
 
 - Redesign components based on test results [ref above]
- Gaps magnet and ferromagnetic magnetic material
 - Hole sizes for screw (hole on face) [done]
 - Height of component [done]
 
 - Redesign components to make them Radius 25 and Height 15
 - Design tube for the magnet to slide in
 - Design component such that the face ends with acrylic sheet
 - Bismuth beads
 
Accomplishments
Others
Todos
21st October - 25th October, 2013
Plan
- Submit revised multi-target component design v2
 - Conduct experiments with ferromagentic materials
 
Accomplishments
- Submitted lock-key based design for 3D printing
 - Conducted experiments with ferromagnetic material and magnets.
 
Others
Todos
- Conduct further tests with ferromagnetic materials
- Use different magnets
 - Tabulate distance of attraction and magnet strength (and shape?).
 
 - Order magnets
 - Make list of parameters that can be adjusted in revised multi-target component design
 - Make a list of anticipated errors
 - Design refinements to v2 design
- Lip
 - Test blocks for angles
 
 
15th October - 18th October, 2013
Plan for Paderborn
- Design v2 of multi-target self-assembly system
 - Design test blocks to test different parameters
 
Accomplishments
- Designed v2
 - Designed test blocks for:
- Different box sizes for the key
 - Different key shapes based on area of attraction
 
 
Others
Todos
- Conduct tests on magnets
 - Design refinements
 - Make list of anticipated errors
 
07th October - 11th October, 2013
Plan
Accomplishments
Others
Todos
30th September - 04th October, 2013
Plan
- Random shaker design
- Coupling of saw and shaker
 
 - Test on Laser Cutter
 - New 3D printer research
 
Accomplishments
- Requested quote for random shaker
 - Requested quote for basic 2D robot
 - Submitted revised component design to DMRC
 
Others
Todos
22nd - 26th September, 2013
Plan
- Shaker choice
 - Update expenditures
 
Accomplishments
- Revised component design
- No unwanted features
 
 - Read paper and highlight important design attributes
 - Visted Chem and Physics lab
 
Others
Todos
16th - 20th September, 2013
Plan
- Submit revised design for 3D printing
 - Literature review
- Works citing Hosokawa (1996)
 
 
Accomplishments
Others
- 17th September - Received reply from Dr. Hosokawa along with his last work on the self-assembly of multiple structures (1996).
 
Todos
9th - 13th September, 2013
Plan
- Make corrections to the angle test block design based on feedback from Polyjet Printing services [ongoing]
 - Search for shakers [Fisher Scientific, Eppendorf and New Brunswick]
- Weight the shaker is able support atleast 500g of weight
 - 220V Euro plug
 - Metric holes
 
 
Accomplishments
- Compiled a list of shakers
 - Marco sent Xeed an email requesting a status update.
 
Others
Todos
2nd - 6th September, 2013
Plan
- Send Kazuo Hosokawa email regarding paper [done]
 - Shaker research [ongoing]
 
Accomplishments
Others
Todos
- Followup on 3D printer
 
26th - 30th August, 2013
Plan
- Design components for 3D printing
 
- Laser sintering
- Test component to test different sliding angles
 - Test component to test different magnet separation distances
 - Seed component
 - Switchable component
 
 
- Laser sintering
 
- Polyjet
- Test component to test different sliding angles
 - Test component to test different magnet separation distances
 
 
- Polyjet
 
Accomplishments
- Designs submitted
 
Others
Todos
19th - 23rd August, 2013
Plan for Paderborn
- Conduct tests on:
 - Induced error tests: N-N bond etc
 - Complete incomplete experiments
 - Buy M3 3cm length screws
 - Bracket
 - Further search for a random shaker
 - Find state of the art for multiple structure assembly [in process]
 
Accomplishments
Others
- Placed order for magnets
- Magnets are with ULB courier services
 
 
Todos
- Make a list of errors for circle shapes
 
12th - 16th August, 2013
Plan
- Find a shaker that shakes in a random fashion [found one possibility]
 - Find state of the art for multiple structure assembly [in process]
 - Read Hosokawa paper [done]
 - Refinements to existing designs
- Wall thickness [pending]
 - Depth of magnets [run tests in Paderborn]
 - Maximum and minimum structure sizes [cut 15mm and 25mm acrylic components]
 
 - Update lab journal
 - Prepare and pack for Paderborn trip 20130819-23
 
Accomplishments
Others
- Placed order for magnets
- Magnets are with ULB courier services
 
 
Todos
- Make a list of errors for circle shapes
 
5th - 9th August, 2013
Plan
- Reorganise experiment data from Paderborn visit
 - Plot compatibility curve [done]
 - Read Hosokawa paper [PENDING]
 - Refinements to existing designs [in progress]
- Wall thickness
 - Depth of magnets
 - Maximum and minumum structure sizes
 
 - Submit expenses for reimbursement [done]
- Marco transferred 800Euro to my bank account on 9th August, 2013
 
 
Accomplishments
- Followed up with LaserScript - no response
 
Others
- Purchased external hard drive to store videos
 
Todos
- Find a shaker that shakes in a random fashion
 - Find state of the art for multiple structure assembly
 - Read Hosokawa paper [PENDING]
 
29th July - 2nd August, 2013
Plan
- Conduct single target experiments on laser cut and 3D printed components in ABS plastic IR94 container
 - Conduct multiple target experiments on 3D printed and laser cut components
 - Take measurements for new bracket
 
Accomplishments
- Conducted single target experiments with laser cut components in ABS plastic IR94 container
- 45deg segments IR25OR35
 - 90deg segments OR35 circle
 - 90deg segments IR15OR25
 - 90deg segments IR25OR35
 
 - Conducted single target experiments with laser cut components in acrylic IR75 container
- 45deg segments IR25OR35
 - 90deg segments IR25OR35
 - 90deg segments OR35 circle
 
 - Conducted single target experiments with 3D printed components in ABS plastic IR94 container
- 45deg segments IR02OR35
 - 90deg segments IR25OR35
 
 - Conducted single target experiments with 3D printed components in acrylic IR75 container
 
- Conducted multiple target experiments with laser cut components in ABS plastic IR94 container
- 90deg segments IR25OR35 x2
 - 90deg segments IR15OR25 x2
 - 90deg segments IR15OR25 x3
 
 - Conducted multiple target experiments with laser cut components in acrylic IR75 container
- 90deg segments OR35 circle x2
 - 90deg segments IR15OR25 x3
 
 - Conducted multiple target experiments with 3D printed components in ABS plastic IR94 container
- 45deg segments IR02OR25 x2
 - 45deg segments IR02OR35 x2
 - 90deg segments IR25OR35 x2
 
 - Conducted multiple target experiments with 3D printed components in acrylic IR75 container
- 45deg segments IR02OR25 x4
 
 
Others
Todos
- Go through JICBackup_videos on kelvin workstation
 
22nd - 26th July, 2013
Plan
- Conduct tests on N-N error reduction designs
 - Cut IR100mm container
 - Bracket revision!
 - Send LaserScript feedback email
 - Prepare for Paderborn trip
- Make a plan for experiments
 - Make a list and pack
 
 
Accomplishments
Others
Todos
- Update expenses spreadsheet [done]
 - Submit expenses to Muriel [done]
 
15th - 19th July, 2013
Plan
- Send LaserScript email [done]
 - Update SVN
 - Cut IR 100mm container
 - Bracket!
 - Find ways to reduce N-N errors [in progress]
 
Accomplishments
- The laser cutter was previously not calibrated accurately and caused errors in cuts. The cutter is now better calibrated.
 - Purchased 5mm plexi-glass sheet, 3 wood beams and Brico Discount Card [€195,47]
 - Designed and cut three modifications to reduce N-N error
- Curved edge
 - Flanged edge
 - Filleted edges
 
 
Others
Todos
8th - 12th July, 2013
Plan
- Send bracket sizes to Navneet [Done, €14,59]
 - Update Experiments spreadsheet [done]
- Include dimensions of Big and Small environments [done]
 
 - Deeper cuts [done]
 - Inclined holes [done]
 
Accomplishments
- Found suitable air-gap for components
 - Found configurations for components with inclined holes to bond
- v-shape
 - straight line (causes the pieces to be offset)
 
 
Others
- Meeting with Mauro:
- Purchasing acrylic in bulk
 - Laser cutter calibration
 
 
To dos
- Send LaserScript email regarding errors in calibration
 - Deal with bracket fit
 
1st - 5th July, 2013
Plan
- Paderborn visit (3rd - 5th July, 2013)
- Pack
- Cameras, chargers, cables, memory cards and tripod
 - Data storage
 - Design notebook, theses, papers
 - Magnets
 - Glue, tape
 - Bracket, environments, lids
 - Wing nuts, hex nuts, screws, bolts
 - Measuring instruments: vernier, rulers etc.
 
 - Tests
- Assemble components
 - Run single ring, two ring, extra pieces tests
 
 - Shaker details
 
 - Pack
 
Accomplishments
- Hand held experiments at IRIDIA
- Captured videos of single ring and multiple ring assembly experiments. Tabulated the results.
 - Conducted tests with extra pieces. The extra pieces used were were:
- Quarter circle
 - Full circle
 
 
 - Shaker experiments in Paderborn
- Speed tests
- Acrylic environment: acrylic components and ABS plastic components
 - ABS plastic environment: acrylic components and ABS plastic components
 - Tabulated results
 
 - Assembly tests
- Big acrylic environment: 90deg ring segments, 45deg ring segments, 90deg circle segments
 - Small acrylic environment: 90deg ring segments, 45deg ring segments, 90deg circle segments
 - Tabulated results
 
 - Captured videos
 
 - Speed tests
 
To do
- Send bracket sizes to Navneet
 - Update Experiments spreadsheet
- Include dimensions of Big and Small environments
 
 - Deeper cuts
 - Inclined holes
 
Others
24th - 28th June, 2013
Plan
- Purchased [done]:
- Washer/spacer for M7 and M8 screws - 1 each
 - 2m x 1m x 3mm Acrylic sheet - 1
 - 6mm Clips - 1
 - TOTAL : 111,97 Euro
 
 - Fabricate rings with lesser width [done]
 - Test to see if two rings can form simultaneously [done]
 - Prepare files and equipment for transport to Paderborn
 
Accomplishments
- Self assembly of:
- Circle: IR 2mm OR 35mm
 - 1 ring: 90deg segments IR 20mm OR 35mm
 - 1 ring: 45deg segments IR 20mm OR 35mm
 - 2 rings: 90deg segments IR 20mm OR 35mm
 - 3 rings: 90deg segments and 45deg segments
 
 
Others
17th - 21st June, 2013
Plan
- Purchase acrylic sheets, MDF boards, sand-paper, glue [done] €184,46
 - Design and fabricate container for testing in July [done v2, shelved v1]
- Design coupling that will allow any container to be easily mounted onto the shaker. [done v2, shelved v1]
 
 - Update Design Journal and Technical Report.
 - Design rings with lesser width
- Observe lateral bonding
 
 
Accomplishments
- Developed first self-assembling structure.
 
- Estimated cutting errors for the Laser Cutter [done]
- Included the design considerations needed to be taken into account because of the errors on the Laser cutter wiki [done]
 - Details of the error testing File:LaserCutter Tests.pdf
 
 - Purchased I-section nd L-section channels which will be used as the coupling that will join the container and the shaker. €7,59
 - Purchased nuts, bolts and washers. €8,77
 - Fabricated and assembled container(s) and brackets
- Containers: IR 75mm and IR 135mm
 - Bracket
 
 
Other
10th - 14th June, 2013
Plan
- Submit designs for fabrication [done]
- Ensure pieces mate before submission [done]
 
 - Update reports and address Navneet's comments
- Reorganised files and directories [done]
 - Revised time lines to reflect 2 week turn around time for 3D printing [done]
 - Create entries for 20130607 [done]
 - Update Design journal
 
 - Design and fabricate lid [done]
 - Design revision
 - Assembly simulations in SolidWorks [done]
 
Other
- Procured 2 suitable glues for acrylics
 - Procured magnets
 - Test finishing with the 2 glues
 - Cut arcs with acrylic
 
3rd - 7th June, 2013
Plan
- RAR defense [done]
 - Set up SVN [done]
 - Create two docs: Lab report and detailed report and include them in SVN [done]
 - Update Lab report based on meeting with Navneet [done]
 - Understood basics of SolidWorks [done]
 
Other
- Semi ring designed in SolidWorks
 
1st March, 2013
Literature Review
Project Work
- Work on FRS-FNRS Fellowship application
 - Work on Self-Reproduction Review Paper
 - Talk in Dubai
 
Development
Laboratory Activities
- Assisting in big-arena robot storage setup
 
Ideas
Deliverable
- Synthetic Reproduction Review Paper due by May 2013
 - Defense of Report of Advancement on 17th May 2013
 
