Theory of incompatible substructure problem
From IridiaWiki
Jump to navigationJump to searchSchedule
- 1st December, 2014 : Submit final draft of Conformational Switching paper to Marco
- 22nd November, 2014 : Finish first draft of Conformational Switching paper
- 8th November, 2014 : Finalise results, create plots
- 1st November, 2014 : Finalise plan for experiments and collect preliminary data
Todo
- Outline by 8th November
- Mount existing container on shaker
Experiments
- Self-assembly experiment at different speeds:
- Result: self-assembly time distribution for each speed; use in experiments speed with lowest average time to completion + 2 std. dev.
- 2 target structure
- 3 target structure
- 4 target structure
- 5 target structure
Particulars of experiments (10 trials each)
- Photos of initial condition and final condition
- Self-assembly experiment at different speeds:
- Run each experiment till self-assembly of one, two, three and four target structures
- Use different speeds starting from lowest speed (= when components start to move) and increment speed by 25 rpm till target structure breaks.
- Assembly of one target structure (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
- Results to show
- Result 1
- Result 2
- Result 3
- Result 4