Difference between revisions of "Conformational Switching"
From IridiaWiki
Jump to navigationJump to searchLine 5: | Line 5: | ||
* 1st October, 2014 : Finalise conformational switching component design |
* 1st October, 2014 : Finalise conformational switching component design |
||
* 18th September, 2014 : Return from PPSN |
* 18th September, 2014 : Return from PPSN |
||
+ | |||
+ | == Todo == |
||
+ | * Outline by 6th September |
||
+ | * Send container designs |
||
+ | * Run trials |
||
+ | * Mount existing container on shaker |
||
== Experiments == |
== Experiments == |
Revision as of 18:32, 4 September 2014
Schedule
- 1st December, 2014 : Submit final draft of Conformational Switching paper to Marco
- 1st November, 2014 : Finalise results and finish first draft of Conformational Switching paper
- 15th October, 2014 : Finalise experiments
- 1st October, 2014 : Finalise conformational switching component design
- 18th September, 2014 : Return from PPSN
Todo
- Outline by 6th September
- Send container designs
- Run trials
- Mount existing container on shaker
Experiments
- Test to verify role of seed
- Components with seed
- Components without seed
- Assembly of one target structure
- Conformational switching
- Simple
- Assembly of multiple target structures
- Conformational switching
- Simple