Difference between revisions of "Theory of incompatible substructure problem"
From IridiaWiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Schedule == |
== Schedule == |
||
− | * |
+ | * 19th December, 2014 : Submit final draft of incompatible substructure paper to Marco |
− | * |
+ | * 30th November, 2014 : Finish results, create plots |
− | * 8th November, 2014 : Finalise results, create plots |
||
− | * 1st November, 2014 : Finalise plan for experiments and collect preliminary data |
||
== Todo == |
== Todo == |
||
+ | |||
− | * Outline by 8th November |
||
+ | == Parameters == |
||
− | * Mount existing container on shaker |
||
+ | * Components |
||
+ | ** Radius of each component: 25 mm |
||
+ | ** Thickness of each component: '''8 mm''' |
||
+ | ** Radius of magnet: 1.5 mm |
||
+ | ** Strength of magnet: N48 |
||
+ | ** Polyamide |
||
+ | |||
+ | * Container |
||
+ | ** Radius of container: 125 mm |
||
+ | ** Depth of container: 9 mm |
||
+ | ** Material: Acrylic |
||
+ | |||
+ | * Shaker |
||
+ | ** Mode: Orbital shaking |
||
+ | ** Speed: 300 rpm |
||
+ | ** Duration for shaking: until stable structures are formed |
||
== Experiments == |
== Experiments == |
||
⚫ | |||
− | * Self-assembly experiment at different speeds: |
||
+ | * Assembly of 2 target structures |
||
− | ** Result: self-assembly time distribution for each speed; use in experiments speed with lowest average time to completion + 2 std. dev. |
||
− | * |
+ | * Assembly of 3 target structures |
− | * |
+ | * Assembly of 4 target structures |
− | * |
+ | * Assembly of 5 target structures |
⚫ | |||
=== Particulars of experiments (10 trials each) === |
=== Particulars of experiments (10 trials each) === |
Revision as of 16:28, 25 November 2014
Schedule
- 19th December, 2014 : Submit final draft of incompatible substructure paper to Marco
- 30th November, 2014 : Finish results, create plots
Todo
Parameters
- Components
- Radius of each component: 25 mm
- Thickness of each component: 8 mm
- Radius of magnet: 1.5 mm
- Strength of magnet: N48
- Polyamide
- Container
- Radius of container: 125 mm
- Depth of container: 9 mm
- Material: Acrylic
- Shaker
- Mode: Orbital shaking
- Speed: 300 rpm
- Duration for shaking: until stable structures are formed
Experiments
- Assembly of 1 target structure
- Assembly of 2 target structures
- Assembly of 3 target structures
- Assembly of 4 target structures
- Assembly of 5 target structures
Particulars of experiments (10 trials each)
- Photos of initial condition and final condition
- Self-assembly experiment at different speeds:
- Run each experiment till self-assembly of one, two, three and four target structures
- Use different speeds starting from lowest speed (= when components start to move) and increment speed by 25 rpm till target structure breaks.
- Assembly of one target structure (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
- Results to show
- Result 1
- Result 2
- Result 3
- Result 4