Difference between revisions of "Conformational Switching"
From IridiaWiki
Jump to navigationJump to search (Created page with "== Schedule == * 1st December, 2014 : Submit final draft of Conformational Switching paper to Marco * 1st November, 2014 : Finalise results and finish first draft of Confor…") |
(→Todo) |
||
(22 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
== Schedule == |
== Schedule == |
||
+ | * TBD |
||
− | * 1st December, 2014 : Submit final draft of Conformational Switching paper to Marco |
||
+ | |||
− | * 1st November, 2014 : Finalise results and finish first draft of Conformational Switching paper |
||
+ | == Todo == |
||
− | * 15th October, 2014 : Finalise experiments |
||
− | * |
+ | * Finalise pendulum design |
+ | * Run experiments |
||
− | * 18th September, 2014 : Return from PPSN |
||
+ | |||
+ | == Experiments == |
||
+ | * Self-assembly experiment at different speeds: |
||
+ | ** Result: self-assembly time distribution for each speed; use in experiments speed with lowest average time to completion + 2 std. dev. |
||
+ | * Test to verify role of seed: |
||
+ | ** Passive components, no seed |
||
+ | ** Passive components, AND seed |
||
+ | |||
+ | === Particulars of experiments (10 trials each) === |
||
+ | * Video recording of experiments, probably one frame every second (1 fps). |
||
+ | * Self-assembly experiment at different speeds: |
||
+ | ** Run each experiment till self-assembly of one target structure |
||
+ | *** All components are seeds |
||
+ | *** Passive components, no seed |
||
+ | *** Passive components, AND seed |
||
+ | ** Use different speeds starting from lowest speed (= when components start to move) and increment speed by 25 rpm till target structure breaks. |
||
+ | |||
+ | * Assembly of one target structure (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets) |
||
+ | ** The results of the experiment where all the components are seeds and the experiment where there are passive components and a seed ''should have the same yield'' |
||
+ | ** All components are seeds |
||
+ | ** Passive components, no seed |
||
+ | ** Passive components, AND seed |
||
+ | |||
+ | * Assembly of two target structures (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets) |
||
+ | ** When there are components (only seeds) enough to make more than one target structure, the incompatible substructure problem is observed |
||
+ | ** All components are seeds |
||
+ | ** Passive components, no seed |
||
+ | ** Passive components, AND seed |
||
+ | |||
+ | * Results to show |
||
+ | ** Experiments for setting parameter (shaking speed) |
||
+ | ** Time evolution of self-assembly |
||
+ | ** Conformational switching eliminates incompatible structures |
||
+ | ** Scaling |
||
+ | ** Removing the acceleration rump-up phase |
||
+ | ** Plot of Gibbs free energy |
||
+ | *** Gibbs free energy related to the number of available bonding sites. |
||
+ | |||
+ | == Meeting minutes == |
||
+ | [[File:Meeting1.jpg|250px|thumb|left|Meeeting 1 whiteboard capture]] |
||
+ | [[File:Meeting2.jpg|250px|thumb|left|Meeeting 2 whiteboard capture]] |
Latest revision as of 15:36, 20 April 2016
Schedule
- TBD
Todo
- Finalise pendulum design
- Run experiments
Experiments
- Self-assembly experiment at different speeds:
- Result: self-assembly time distribution for each speed; use in experiments speed with lowest average time to completion + 2 std. dev.
- Test to verify role of seed:
- Passive components, no seed
- Passive components, AND seed
Particulars of experiments (10 trials each)
- Video recording of experiments, probably one frame every second (1 fps).
- Self-assembly experiment at different speeds:
- Run each experiment till self-assembly of one target structure
- All components are seeds
- Passive components, no seed
- Passive components, AND seed
- Use different speeds starting from lowest speed (= when components start to move) and increment speed by 25 rpm till target structure breaks.
- Run each experiment till self-assembly of one target structure
- Assembly of one target structure (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
- The results of the experiment where all the components are seeds and the experiment where there are passive components and a seed should have the same yield
- All components are seeds
- Passive components, no seed
- Passive components, AND seed
- Assembly of two target structures (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
- When there are components (only seeds) enough to make more than one target structure, the incompatible substructure problem is observed
- All components are seeds
- Passive components, no seed
- Passive components, AND seed
- Results to show
- Experiments for setting parameter (shaking speed)
- Time evolution of self-assembly
- Conformational switching eliminates incompatible structures
- Scaling
- Removing the acceleration rump-up phase
- Plot of Gibbs free energy
- Gibbs free energy related to the number of available bonding sites.