Difference between revisions of "Conformational Switching"

From IridiaWiki
Jump to navigationJump to search
Line 17: Line 17:
   
 
=== Particulars of experiments (10 trials each) ===
 
=== Particulars of experiments (10 trials each) ===
 
* Video recording of experiments, probably one frame every second (1 fps).
 
* Self-assembly experiment at different speeds:
 
* Self-assembly experiment at different speeds:
 
** Run each experiment till self-assembly of one target structure
 
** Run each experiment till self-assembly of one target structure
Line 33: Line 34:
 
** Passive components, no seed
 
** Passive components, no seed
 
** Passive components, AND seed
 
** Passive components, AND seed
 
* Video recording of experiments, probably one frame every seconds.
 
   
 
* Results to show
 
* Results to show
 
** Experiments for setting parameter (shaking speed)
 
** Experiments for setting parameter (shaking speed)
 
** Time evolution of self-assembly
 
** Time evolution of self-assembly
** Conf switch eliminates incompatible structures
+
** Conformational switching eliminates incompatible structures
 
** Scaling
 
** Scaling
 
** Removing the acceleration rump-up phase
 
** Removing the acceleration rump-up phase

Revision as of 17:31, 24 October 2014

Schedule

  • 1st December, 2014 : Submit final draft of Conformational Switching paper to Marco
  • 22nd November, 2014 : Finish first draft of Conformational Switching paper
  • 8th November, 2014 : Finalise results, create plots
  • 1st November, 2014 : Finalise plan for experiments and collect preliminary data

Todo

  • Outline by 8th November
  • Mount existing container on shaker

Experiments

  • Self-assembly experiment at different speeds:
    • Result: self-assembly time distribution for each speed; use in experiments speed with lowest average time to completion + 2 std. dev.
  • Test to verify role of seed:
    • Passive components, no seed
    • Passive components, AND seed

Particulars of experiments (10 trials each)

  • Video recording of experiments, probably one frame every second (1 fps).
  • Self-assembly experiment at different speeds:
    • Run each experiment till self-assembly of one target structure
      • All components are seeds
      • Passive components, no seed
      • Passive components, AND seed
    • Use different speeds starting from lowest speed (= when components start to move) and increment speed by 25 rpm till target structure breaks.
  • Assembly of one target structure (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
    • All components are seeds
    • Passive components, no seed
    • Passive components, AND seed
  • Assembly of two target structures (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
    • All components are seeds
    • Passive components, no seed
    • Passive components, AND seed
  • Results to show
    • Experiments for setting parameter (shaking speed)
    • Time evolution of self-assembly
    • Conformational switching eliminates incompatible structures
    • Scaling
    • Removing the acceleration rump-up phase
    • Plot of Gibbs free energy

Meeting minutes

Meeeting 1 whiteboard capture
Meeeting 2 whiteboard capture