Difference between revisions of "Conformational Switching"

From IridiaWiki
Jump to navigationJump to search
Line 6: Line 6:
   
 
== Todo ==
 
== Todo ==
* Outline by 6th September
+
* Outline by 8th November
* Send container designs
 
* Run trials
 
 
* Mount existing container on shaker
 
* Mount existing container on shaker
   

Revision as of 14:29, 24 October 2014

Schedule

  • 1st December, 2014 : Submit final draft of Conformational Switching paper to Marco
  • 22nd November, 2014 : Finish first draft of Conformational Switching paper
  • 8th November, 2014 : Finalise results, create plots
  • 1st November, 2014 : Finalise plan for experiments and collect preliminary data

Todo

  • Outline by 8th November
  • Mount existing container on shaker

Experiments

  • Speed test
  • Time test
  • Test to verify role of seed
    • Passive components, no seed
    • Passive components, AND seed

Particulars of experiments (10 trials each)

  • Assembly of one target structure (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
    • Simple
    • Passive components, no seed
    • Passive components, AND seed
  • Assembly of two target structures (Data to be collected: number of individual components, number of compatible substructures, number of incompatible substructures, number of targets)
    • Simple
    • Passive components, no seed
    • Passive components, AND seed

Meeting minutes

Meeeting 1 whiteboard capture
Meeeting 2 whiteboard capture