Difference between revisions of "Conformational Switching"

From IridiaWiki
Jump to navigationJump to search
Line 5: Line 5:
 
* 1st October, 2014 : Finalise conformational switching component design
 
* 1st October, 2014 : Finalise conformational switching component design
 
* 18th September, 2014 : Return from PPSN
 
* 18th September, 2014 : Return from PPSN
  +
  +
== Todo ==
  +
* Outline by 6th September
  +
* Send container designs
  +
* Run trials
  +
* Mount existing container on shaker
   
 
== Experiments ==
 
== Experiments ==

Revision as of 18:32, 4 September 2014

Schedule

  • 1st December, 2014 : Submit final draft of Conformational Switching paper to Marco
  • 1st November, 2014 : Finalise results and finish first draft of Conformational Switching paper
  • 15th October, 2014 : Finalise experiments
  • 1st October, 2014 : Finalise conformational switching component design
  • 18th September, 2014 : Return from PPSN

Todo

  • Outline by 6th September
  • Send container designs
  • Run trials
  • Mount existing container on shaker

Experiments

  • Test to verify role of seed
    • Components with seed
    • Components without seed
  • Assembly of one target structure
    • Conformational switching
    • Simple
  • Assembly of multiple target structures
    • Conformational switching
    • Simple
Meeeting 1 whiteboard capture
Meeeting 2 whiteboard capture